Bacon, R., Besant-Jones, J., Heidarian, J. Estimating Construction Costs and Schedules. Washington: The World Bank, 1996 XV, 120 с, 0-8213-3670-3.
Bacon, R., Besant-Jones, J., Heidarian, J. Estimating Construction Costs and Schedules. Washington: The World Bank, 1996 XV, 120 с, 0-8213-3670-3.
Bacon, R., Besant-Jones, J., Heidarian, J. (1996) Estimating Construction Costs and Schedules, Washington: The World Bank XV, 120 с, 0-8213-3670-3.
Bacon, R., Besant-Jones, J., & Heidarian, J. (1996). Estimating Construction Costs and Schedules. Experience with Power Generation Projects in Developing Countries. Washington: The World Bank, XV, 120 с.
Bacon R, Besant-Jones J, Heidarian J. Estimating Construction Costs and Schedules: Experience with Power Generation Projects in Developing Countries. Washington: The World Bank; 1996. p. XV, 120 с. ISBN: 0-8213-3670-3.